Loading Dock Installation in Los Angeles, CA
Project: Sunset Loading Dock
Project Overview:
As part of a new mixed-use development, a grocery store loading dock was completed with a WestWood surface system designed to accommodate the demands of a commercial delivery area. The installation provided a durable, protective surface for the newly constructed facility, supporting the daily movement of deliveries and loading operations.
Size: ~3,500 ft²
Substrate: Concrete
WestWood products:
- Wecryl 176 Primer
- Wecryl R 230 System
- Wecryl 337 Mortar
- Wecryl 419
The Challenge
The project involved a loading dock within a newly constructed mixed-use building featuring a supermarket and residential units above. The installation required a durable surface solution capable of withstanding the demands of a busy commercial loading area.
The WestWood Solution
WestWood’s fast-curing system was installed to provide a durable, traffic-resistant surface suitable for heavy-duty commercial applications. Completed in just four shifts, the installation provided an efficient solution for protecting the supermarket’s loading dock while minimizing installation time.
Project Results
The completed installation provided a seamless, high-performance surface with enhanced traction for trucks and delivery vehicles. The finished system offers long-term surface protection while supporting the operational demands of frequent deliveries and daily commercial traffic.
Featured Project Partners
